Introduction of 1st Plant Equipment and Contents of Work
-
External Appearance of 1st FactoryHead Office: Management, Sales, Technology
1st Factory: Cutting, Processing, Welding
Site Area: 1067m2
Building: 730 m2
-
Office and Design Room (Inside of 1st Factory)
-
Processing Plant (inside of 1st Factory)
-
Cutting Processing Area[Equipment]
·Machining Centre and NC Milling Machine
·General-purpose Milling Machines, NC Lathes, and General-purpose Lathes Stainless processing is our speciality.
-
Panel Beating and Processing Area[Equipment]
·Shearing Machine, Bending Machine, Corner Shearing Machine
·Punch Press
Introduction of 2nd Plant and Equipment, and Contents of Work]
-
2nd FactoryAn assembly of large-scale equipment and precision instruments is mainly performed.
Site Area: 1286 m2
Building: 730 m2
[Equipment] One 2.8t Crane and Air-conditioners
-
2nd Factory
-
Assembling WorkEquipment is assembled while the skilled workers check the state and accuracy of parts. Work is continued while they feedback to the design section the problem which has not been noticed in a design phase.
Introduction of 3rd Plant and Equipment, and Contents of Work
-
3rd Factory
-
Clean RoomClean Room: 330 m2, Front Room (Packaging Room): 90 m2, Degree of Cleanness: Class10,000
We can cope with the customers who need clean environment such as medicine and food industries as well as semiconductor and liquid crystal industries.
-
Assembly PlantThis is a precision instrument assembly plant which is bright and clean environment.
The assembly of equipment is performed here and electric wiring work is performed.
Then, the assembled equipment moves to the clean room adjoining to here, and the adjustment and debugging work are performed. Afterwards, the product is cleaned up, packaged, and delivered.